NEO Bankside
Home > Case Studies > NEO Bankside
The site at NEO Bankside; see’s the construction of 4 Residential Tower Blocks (2NO 12 Floor, 1NO 18 Floor & 1NO 24 Floor) springing off of a 4,500m2 Podium Slab.
Each Tower Block was formed traditionally. The project benefitting from the use of our Rail Climbing Protection System, affording full edge protection to our systems & resources throughout the whole of the construction process.
Approximately 19,500m3 of concrete together with 63,000m2 of formwork have been used to form the works
Overview
- Client: Carillion Building
- Contract value: £14,500,000
- Programme: April 2009 to April 2011
- Location: Southwark